(for 08 August - Block 2)
Design finished on GOOGLE SKETCHUP
(final slides of presentation)
( SCROLL DOWN FOR STRUCTURAL SUPPORT )
MODEL 3
Employers input (Sketches)
Model 3 - MY SKETCHES
Model 3 - PROCESS MODEL
Support inside Masonary Wall (LANDMARK)
The 200 diameter gum polls are inserted to prevent the masonry wall from colapsing, because of the top floors weight.
Support Structure of First Floor (STAGE)
150 diameter gum polls are rapt in d.p.m & then built into the masonry wall. The other side of these gum polls are resting on 200 diameter polls situated into the ground.
Support Structure of STAIRS
150 diameter gum polls are, one by one, built ionto the wall, but only an overhang of 800mm could be made otherwise the strairs will crack under presure if it is overhanged more.
Support Structure of Second Floor (SOCIAL AREA)
200 diameter gum polls are rapt in d.p.m & then built into the masonry wall. The other side of these gum polls are resting on 200 diameter polls support structure.
ROOF STRUCTURE
150 diameter polls are built diagonally into wall & then supported by 20 diameter super-Macro ropes.
END PRODUCT (WHOLE MODEL)
The entire Dome landscape will stay the same, with the trees & plants surrounding the structure.
New Precedent
MODEL 1
GROUP 8
Hub Technology precedent: exercise 1 (04/03/11)